m (1 revision imported) |
m (1 revision imported) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 20: | Line 20: | ||
|name=Inspect | |name=Inspect | ||
|parent=sc:M4 | |parent=sc:M4 | ||
− | |sort= | + | |sort=5340700 |
|level=3 | |level=3 | ||
}} | }} |
The activities associated with testing the result of the M4 process. This includes identifying the testing process, taking a sample of the material, transporting the sample or the material to the testing/inspection location, testing or inspecting the material, returning the product and recording/publishing the test results.
The outcome of the Inspect process is a quality inspection pass or fail or a return to further Examination.
For more complex use cases this may include multiple iterations of M404 - Issue Materials - M406 - Inspect. Orders Defect Free Ratio Make Cycle Time Days of WIP Inventory Work-in-Process Inventory - Restricted Work-in-Process Quality Control Return
ID | Name | Level | x |
---|---|---|---|
DP12 | Orders Defect Free Ratio | 2 | DP12 |
RS13 | Make Cycle Time | 2 | RS13 |
AE122 | Days of WIP Inventory | 3 | AE122 |
AE1222 | Work-in-Process Inventory - Restricted | 4 | AE1222 |
| Process |
| ||||
---|---|---|---|---|---|---|
M407 | ||||||