Actions

M-BOM

Difference between revisions of "M-BOM"

m (1 revision imported)
 
m (1 revision imported)
 
(No difference)

Latest revision as of 01:34, 22 August 2020

M-BOM is an acronym for Manufacturing BOM, a BOM maintained and used for production scheduling purposes. More extensive than Planning BOMs, Manufacturing BOMs include all materials or parts that are needed to schedule production. This excludes Drip Parts and other parts or materials that do not require detailed scheduling/availability checking.

M-BOMs typically only contain the current revision of parts or materials.

Alternative notations for Manufacturing BOM includes: mBOM. Engineering BOM

Hierarchy

IDNameLevelx
BOMBill of Materials1BOM
M-BOMManufacturing BOM2M-BOM

Process(es)

IDNameLevelx
M1Make-to-Stock2M1
M101Create Schedule3M101
M201Create Order3M201
M202Schedule Make Orders3M202
M301Create Project Order3M301
M302Complete Order Engineering3M302
M303Schedule Resources3M303
M4Re-Make2M4
M402Schedule Work Orders3M402
M410Transfer3M410

Term(s)

IDNameClearx
BOMBill of MaterialsBOM
E-BOMEngineering BOME-BOM
P-BOMPlanning BOMP-BOM
Manufacturing BOM Bill of Materials 2 2 {{{keywords}}} {{{description}}}