Actions

P301

Difference between revisions of "P301"

m (1 revision imported)
 
Line 16: Line 16:
 
|name=Gather Demand for Make
 
|name=Gather Demand for Make
 
|parent=sc:P3
 
|parent=sc:P3
|sort=130100
+
|sort=530100
 
|level=3
 
|level=3
 
|keywords=Calculate, Production, Plan, Make, Capacity, Resources, Supply Chain, Manufacturing, Repair, Recycling
 
|keywords=Calculate, Production, Plan, Make, Capacity, Resources, Supply Chain, Manufacturing, Repair, Recycling
 
|description=Calculating the gross demand for produced material (Make Products)
 
|description=Calculating the gross demand for produced material (Make Products)
 
}}
 
}}

Revision as of 01:34, 27 October 2021

The activities associated with calculating the gross demand for produced material ("Make Products"). This includes gathering, consolidating and aggregating forecast and/or actual demand by production asset (e.g. plant).

The output of this process is the demand (forecast) for the inventory/production completions netting process (P303), typically by plant, product and period.

Use Cases

  • Demand for FG to be produced
  • Demand for sub-assemblies, semi-finished goods, intermediates
  • Forecast and/or actual planned repairs (Reverse Logistics supply chains)

Master Production Schedule t:PP Planning Frequency

Hierarchy

IDNameLevelx
P3Plan Make2P3
P301Gather Demand for Make3P301

Metric(s)

IDNameLevelx
RS11Planning Frequency2RS11

Term(s)

IDNameClearx
MakeMake ProductMake
MPSMaster Production ScheduleMPS

Workflow

FromInput(s)
Process
Output(s)To
wf_processwf_arrow
P106Supply Chain Operations Plan
P305Plan Optimization Action
P301
Gather Demand for Make Plan Make 530100 3 Calculate, Production, Plan, Make, Capacity, Resources, Supply Chain, Manufacturing, Repair, Recycling Calculating the gross demand for produced material (Make Products)