Actions

M205

Difference between revisions of "M205"

m (1 revision imported)
(No difference)

Revision as of 03:26, 5 October 2017

The activities associated with testing the output of a production process. This includes identifying the testing process, taking a sample of the material, transporting the sample or the material to the testing/inspection location, testing or inspecting the material, returning the material and publishing the test results. Product inspection may occur in-process, between stages or post production completion.

Use Cases

  • Configuration specific test instructions/process
  • Inspection of work completed at the previous station on an assembly line
  • Sample testing in staging area
  • End of production line final inspections/QC

Orders Defect Free Ratio Make Cycle Time Days of WIP Inventory Work-in-Process Inventory - Restricted Quality Control Return Laboratory Information Management System Plan-to-Produce

Hierarchy

IDNameLevelx
M2Make-to-Order2M2
M205Inspect3M205

Metric(s)

IDNameLevelx
DP12Orders Defect Free Ratio2DP12
RS13Make Cycle Time2RS13
AE122Days of WIP Inventory3AE122
AE1222Work-in-Process Inventory - Restricted4AE1222

Term(s)

IDNameClearx
LIMSLaboratory Information Management SystemLIMS
P2PPlan-to-ProduceP2P
QCQuality ControlQC
RL3Quality Control ReturnRL3

Workflow

FromInput(s)
Process
Output(s)To
M205
Inspect Make-to-Order 320500 3 {{{keywords}}} {{{description}}}