Line 6: | Line 6: | ||
|name=Validate To-Be Network Design | |name=Validate To-Be Network Design | ||
|parent=sc:A2 | |parent=sc:A2 | ||
− | |sort= | + | |sort=4121100 |
|level=3 | |level=3 | ||
}} | }} |
The activities associated with the testing and verification of proposed network changes. This includes testing functional design and verification against business policies, objectives and other decision criteria.
Tools: Risk Scenario Testing, Environmental Impact Study, Simulation.
| Process |
| ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
A211 |
|
||||||||||||||