Actions

A312

Difference between revisions of "A312"

(No difference)

Revision as of 14:22, 27 October 2021

The activities associated with documenting the changes to technology solutions in support of the proposed process and supply chain network changes. This includes documenting impact of process changes on technology solutions:

  • Find new technology solution
  • Install new technology solution
  • Configure new technology solution
  • Re-configure existing technology
  • Uninstall/retire existing technology

Typically these changes are documented in a Business Requirements Document (BRD). A BRD describes the changes required on technology expressed in business language and is the basis for further analysis by a technology-specific team to describe the detailed technological changes required to support the process change. The output of such process is a System Requirements Document (SRD) and is out of scope for SCM processes. See: ITSM, ITIL and other frameworks.

Hierarchy

IDNameLevelx
A3Align Processes2A3
A312Assess Technology Changes3A312

Workflow

FromInput(s)
Process
Output(s)To
A312
wf_arrowwf_process
Process Change PortfolioA313
Assess Technology Changes Align Processes 4131200 3 {{{keywords}}} {{{description}}}