m (5 revisions imported: 2025 Release) |
|
(No difference)
| |
Produced Quality measures the percentage produced according to planned specification ('to-spec'). To-spec means the product was not devalued, marked as 'rework required', or disposed due to not meeting the design specifications of the product produced..
| Produced Quality Ratio | ||||
| = |
| |||
where:
Unit of measure:
| ID | Name | Level | x |
|---|---|---|---|
| AE31 | Overall Equipment Efficiency | 2 | AE31 |
| AE313 | Produced Quality | 3 | AE313 |
| AE3131 | Devalued Rate | 4 | AE3131 |
| AE3132 | Rework Required Rate | 4 | AE3132 |
| AE3133 | Dispose Rate | 4 | AE3133 |