(Created page with "{{this}} measures the time that equipment or a factory is operating (being utilized) as a percentage of its maximum potential capacity. ===Calculation=== {{math|{{this}}|{{fr...") |
||
Line 1: | Line 1: | ||
− | {{this}} measures | + | {{this}} measures the time that equipment or a factory is operating (being utilized) as a percentage of its maximum potential capacity. |
===Calculation=== | ===Calculation=== | ||
− | {{math|{{this}} | + | {{math|{{this}}|{{frac|Planned Production Time|Total Time|100 %}}}} |
− | where: | + | {{where|%|[[m:AE311]]|The percentage of time the equipment is ready and able to run, excluding planned and unplanned downtime.|[[m:AE312]]|The percentage of time the equipment is running at its maximum speed, without minor stops or slow cycles.|[[m:AE313]]|The percentage of good parts produced, excluding defects or rework. |
− | + | }} | |
− | |||
− | |||
− | |||
===Importance=== | ===Importance=== | ||
+ | {{this} provides insights in how much potential you have to increase throughput with the equipment you already own. | ||
===Notes=== | ===Notes=== | ||
− | + | {{this}} has an inverse relationship with average cost of goods or cost per unit – the higher the utilization rate, the lower the average cost of goods and vice versa. | |
− | + | [[Category:Metric]][[Category:Supply Chain]] | |
− | [[Category:Metric]] | ||
{{Object | {{Object | ||
− | |name= | + | |name=Capacity Utilization |
|parent=m:AE3 | |parent=m:AE3 | ||
|sort=53200 | |sort=53200 | ||
|level=2 | |level=2 | ||
+ | |keywords=Capacity,Utilization,Productivity,Equipment,Performance,Manufacturing,Make,OEE | ||
+ | |description=The ratio between the total available time and the loading time. | ||
}} | }} |
Capacity Utilization measures the time that equipment or a factory is operating (being utilized) as a percentage of its maximum potential capacity.
Capacity Utilization | ||||
= |
|
{{this} provides insights in how much potential you have to increase throughput with the equipment you already own.
Capacity Utilization has an inverse relationship with average cost of goods or cost per unit – the higher the utilization rate, the lower the average cost of goods and vice versa.
ID | Name | Level | x |
---|---|---|---|
AE3 | Total Equipment Efficiency Performance | 1 | AE3 |
AE32 | Capacity Utilization | 2 | AE32 |
AE321 | Velocity | 3 | AE321 |
AE322 | Utilization Rate | 3 | AE322 |