{{this}} measures the time that production assets, equipment or a factory is operating (being utilized) as a percentage of its maximum potential capacity.  
 
===Calculation===
 
===Calculation===
{{math|{{this}} Ratio|{{frac|Ideal Cycle Time x Total Count|Run Time|100 %}}}}
+
{{math|{{this}}|{{frac|Planned Production Time|Total Time|100 %}}}}
where:
+
{{where|%|Planned Production Time|The time production assets/equipment is planned to operate in days or hours.|Total Time|365 days or 365 x 24 hrs.}}
* Ideal Cycle Time =
 
* Total Count =
 
* Run Time =
 
Unit of measure:
 
 
===Importance===
 
===Importance===
 +
{{this}} provides insights in how much potential you have to increase throughput with the equipment you already own.
 
===Notes===
 
===Notes===
<ins>
+
{{this}} has an inverse relationship with average cost of goods or cost per unit – the higher the utilization rate, the lower the average cost of goods and vice versa.
</ins>
+
[[Category:Metric]][[Category:Supply Chain]]
[[Category:Metric]]
 
 
{{Object
 
{{Object
|name=Equipment Performance
+
|name=Capacity Utilization
 
|parent=m:AE3
 
|parent=m:AE3
 
|sort=53200
 
|sort=53200
 
|level=2
 
|level=2
 +
|keywords=Capacity,Utilization,Productivity,Equipment,Performance,Manufacturing,Make,OEE
 +
|description=The ratio between the total available time and the loading time.
 
}}
 
}}

Latest revision as of 18:54, 27 February 2025

Capacity Utilization measures the time that production assets, equipment or a factory is operating (being utilized) as a percentage of its maximum potential capacity.

Calculation

Capacity Utilization
=
Planned Production Time   × 100 %
Total Time
where:
  • Planned Production Time = The time production assets/equipment is planned to operate in days or hours.
  • Total Time = 365 days or 365 x 24 hrs.
Unit of Measure: %

Importance

Capacity Utilization provides insights in how much potential you have to increase throughput with the equipment you already own.

Notes

Capacity Utilization has an inverse relationship with average cost of goods or cost per unit – the higher the utilization rate, the lower the average cost of goods and vice versa.

Hierarchy

IDNameLevelx
AE3Total Equipment Efficiency Performance1AE3
AE32Capacity Utilization2AE32
AE321Velocity3AE321
AE322Utilization Rate3AE322
Capacity Utilization Total Equipment Efficiency Performance 53200 2 Capacity,Utilization,Productivity,Equipment,Performance,Manufacturing,Make,OEE The ratio between the total available time and the loading time.