m (ORwiki moved page m:AE33 to Produced Quality without leaving a redirect) |
m (5 revisions imported: 2025 Release) |
||
| (2 intermediate revisions by one other user not shown) | |||
| Line 13: | Line 13: | ||
{{Object | {{Object | ||
|name=Produced Quality | |name=Produced Quality | ||
| − | |parent=m: | + | |parent=m:AE31 |
| − | |sort= | + | |sort=53130 |
| − | |level= | + | |level=3 |
}} | }} | ||
Produced Quality measures the percentage produced according to planned specification ('to-spec'). To-spec means the product was not devalued, marked as 'rework required', or disposed due to not meeting the design specifications of the product produced..
| Produced Quality Ratio | ||||
| = |
| |||
where:
Unit of measure:
| ID | Name | Level | x |
|---|---|---|---|
| AE31 | Overall Equipment Efficiency | 2 | AE31 |
| AE313 | Produced Quality | 3 | AE313 |
| AE3131 | Devalued Rate | 4 | AE3131 |
| AE3132 | Rework Required Rate | 4 | AE3132 |
| AE3133 | Dispose Rate | 4 | AE3133 |