m |
m |
||
| Line 2: | Line 2: | ||
===Calculation=== | ===Calculation=== | ||
{{math|{{this}}|[[m:AE31]] × [[m:AE32]] × [[m:AE33]]}} | {{math|{{this}}|[[m:AE31]] × [[m:AE32]] × [[m:AE33]]}} | ||
| − | {{where|%|[[m:AE31]]|The percentage of time the equipment is ready and able to run, excluding planned and unplanned downtime.|[[m:AE32]]| | + | {{where|%|[[m:AE31]]|The percentage of time the equipment is ready and able to run, excluding planned and unplanned downtime.|[[m:AE32]]|The percentage of time the equipment is running at its maximum speed, without minor stops or slow cycles.|[[m:AE33]]|The percentage of good parts produced, excluding defects or rework. |
| + | }} | ||
===Importance=== | ===Importance=== | ||
An {{page}} approaching 100% means that: | An {{page}} approaching 100% means that: | ||
Overall Equipment Efficiency.
| Overall Equipment Efficiency | |
| = | AE31 × Capacity Utilization × m:AE33 |
An Template:Page approaching 100% means that:
| ID | Name | Level | x |
|---|---|---|---|
| AE3 | Total Equipment Efficiency Performance | 1 | AE3 |
| AE31 | Overall Equipment Efficiency | 2 | AE31 |
| AE311 | Equipment Availability | 3 | AE311 |
| AE312 | Equipment Performance | 3 | AE312 |
| AE313 | Produced Quality | 3 | AE313 |