(Created page with "{{this}} (TEEP) measures .. ===Calculation=== {{math|{{this}}|Overall Equipment Efficiency × Capacity Utilization}} {{where|%|Overall Equipment Efficiency| OEE.|Capacity Utilization|The percentage of time the equipment is actually...") |
m (4 revisions imported: 2025 Release) |
||
(3 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
− | {{this}} (TEEP) measures .. | + | {{this}} (TEEP) measures provides the utilization of the true capacity of manufacturing operation. It includes both Equipment Losses, as measured by [[m:AE31]] (OEE), and Schedule Losses, as measured by [[m:AE32]]. |
===Calculation=== | ===Calculation=== | ||
{{math|{{this}}|[[m:AE31]] × [[m:AE32]]}} | {{math|{{this}}|[[m:AE31]] × [[m:AE32]]}} | ||
− | {{where|%|[[m:AE31]]| | + | {{where|%|[[m:AE31]]|[[m:AE311]] x [[m:AE312]] x [[m:AE313]]|[[m:AE32]]|The percentage of time the equipment is actually scheduled for operation (a.k.a. Loading). |
}} | }} | ||
===Importance=== | ===Importance=== |
Total Equipment Efficiency Performance (TEEP) measures provides the utilization of the true capacity of manufacturing operation. It includes both Equipment Losses, as measured by Overall Equipment Efficiency (OEE), and Schedule Losses, as measured by Capacity Utilization.
Total Equipment Efficiency Performance | |
= | Overall Equipment Efficiency × Capacity Utilization |
..
ID | Name | Level | x |
---|---|---|---|
AE | Asset Efficiency | 0 | AE |
AE3 | Total Equipment Efficiency Performance | 1 | AE3 |
AE31 | Overall Equipment Efficiency | 2 | AE31 |
AE32 | Capacity Utilization | 2 | AE32 |