Actions

M304

Difference between revisions of "M304"

m (1 revision imported)
 
(One intermediate revision by one other user not shown)
Line 7: Line 7:
 
[[Link::m:RS13]]
 
[[Link::m:RS13]]
 
[[Link::m:AE122]]
 
[[Link::m:AE122]]
 +
[[Link::t:P2P]]
 
</ins>
 
</ins>
 
{{Object
 
{{Object

Latest revision as of 19:12, 12 July 2022

The activities associated with issuing raw materials, subassemblies, and/or semi-finished goods to a staging area or a production location (line, station, cell, unit or vessel. This includes issuing materials explicitly sourced (S3) for this specific Production Order and may include recording the GI to the Production Order for some or all components/ingredients.

This is a Make-to-Engineering-Order process; Special materials, packaging or equipment may be required. This is typically defined as part of the order-engineering process. RS13 Make Cycle Time Days of WIP Inventory Plan-to-Produce

Hierarchy

IDNameLevelx
M3Make-To-Engineering-Order2M3
M304Issue Resources3M304

Metric(s)

IDNameLevelx
RS13Make Cycle Time2RS13
AE122Days of WIP Inventory3AE122

Term(s)

IDNameClearx
GIGoods IssueGI
P2PPlan-to-ProduceP2P
WOWork OrderWO

Workflow

FromInput(s)
Process
Output(s)To
M304
Issue Resources Make-To-Engineering-Order 5330400 3 {{{keywords}}} {{{description}}}